Module 11: Equipment Pads and Underground Electrical
Equipment pads and underground electrical are the scopes where civil and electrical work collide. Get the pad in the wrong location and the equipment anchor bolt pattern does not match. Forget a pull rope in a conduit and you have to cut open the ductbank to run cable. Miss an embedded conduit and you have to core through a finished pad. This module covers what goes under the equipment before the pour and what goes in the ground before backfill — the work that cannot be corrected after the fact.